Clear CinCom Radio Telecom Consultancy
Clear CinCom Existing clients
For new account login request or problems while trying to log in, please contact
The telecom consultants with unique expertise in GSM-R and indoor coverage network design
Clear cincom photo page
From network validation for the HSL-Zuid high-speed train (Amsterdam - Paris) to a base station audit in Madrid.
Please click on a photo for a wider view.
Tetra (C2000) downlink measurements on the Hanzelijn with the test train and receive antenna on wagon.
Tetra (C2000) downlink measurement setup in the test train mpJules on the Hanzelijn.
Tetra (C2000) uplink measurement setup measuring the Tunnel Drontermeer.
Tetra (C2000) uplink measurement setup Hanzelijn.
GSM-R Continuous Wave measurements in the Dutch city of Oldenzaal
Tetra Donor Cell measurement with Yagi antenna in the Dutch city of Arnhem
Tetra Donor Cell measurement with Cross-Polarized antenna with Hybrid Ring Junction in the Dutch city of Arnhem
Overview on Continuous Wave equipment setup at Amsterdam Central Station
Continuous Wave test antenna mounted on Amsterdam Central Station structure above the railway tracks
View from test antenna onto Amsterdam Central Station platforms and tracks
Overview Continuous Wave Antenna setup next to the Hanzelijn Drontermeer tunnel
Continuous Wave Antenna next to Hanzelijn Drontermeer tunnel service building
Possible antenna location Drontermeer tunnel Hanzelijn during Continuous Wave measurements
Installation of GSM-R site on the High Speed Line in The Netherlands
BTS integration on the High Speed Line in The Netherlands
High speed test train capable of speeds up to 350km/h
Quality of Service test on board high speed train
Speed information panel on board high speed train
Clear CinCom engineers calibrating Alternative Coverage Method software
The prototype measurement equipment for the Alternative Coverage Method
Doppler radar used as distance sensor for the Alternative Coverage Method
MP Jules test train used in GSM-R measurements for The Netherlands
Continuous Wave antenna used in Tunisian GSM-R project
Continuous Wave measurement setup for the GSM-R NCBG project in The Netherlands
Continuous Wave measurement setup mounted on existing D-AMPS mast
Static measurements recorded for the GSM-R Infoplus digital information panel project
Clear CinCom in tunnel radio survey for the implementation of a Leaky Feeder system
GSM site on the island of St. Eustatia tested by Clear CinCom
clearcincom |